The Collector Wind Farm development is located on the Cullerin Range between the Hume Highway and the Collector-Gunning Road in the NSW Southern Tablelands.  

This location was chosen because it is in one of the windiest regions in NSW (within one of six renewable energy precincts identified by the NSW Government).

There is a strong grid connection point to export the clean power generated.

The village of Collector is approximately 4km south-east from the nearest of the proposed turbines. 

The whole project site covers around 6,200 hectares, of which only around 75-100ha will be disturbed during construction.

Maps showing the location of the wind farm within the local area and in proximity to Collector Village, plus the project layout can be downloaded below:

Wind Farm Location Map
Download PDF (2.1 MB)

Proximity to Collector Village Map
Download PDF (2.3 MB)

Site Layout Map
Download PDF (319 KB)

For more information on the location of the Collector Wind Farm: